KLATSMÁNYI BRIGDE

The bridge over the Moson Danube is part of route 813 which bypasses Győr to the east. In this span range this is the first bridge built with network stay cables in Hungary.

Although arch bridges are very cost-effective, the building of such a structure is delicate, which makes the technological design a real challenge. The pieces of the steel structure were put together at the pre‑assembly area. Then the arch bridge was launched to its final position, which was a first and unique solution for Hungary.

Related Links

Construction animation

Awards

Tierney Clark Award – 2018

Construction Award of Merit – 2019

Steel Structure of the Year Award – 2018