The 10 years
survey of the Szent István Tisza-bridge at
Szolnok (built in 1992) has found an extra
deflection of ~7 cm at midspan. In order to
investigate the above feature Pont-TERV Engineering
Consultants has been charged with a control statical
analysis. The multispan continuous beam
superstructure consists of a three span right side
flood bridge, a three span river bridge and a nine
span left side flood bridge. The flood bridges have
been constructed by the incremental launching
technology, the river bridge by the free cantilever
method. The spans are 28,8 + 2x36 + 69 + 120 + 69 +
8x36 + 28,8 m long.
The analysis
has been made with the RM2000 program of TDV Austria,
invented for the analysis of prestressed concrete
bridges. The program is based on a spaceframe FEM
program, but contains special modules for the
analysis of the cross-sections, the tendon geometry,
the prestressing actions and losses and for the time
dependent modelling of the creep and shrinkage
behaviour.
The number and geometry of the
tendons, the prestressing data and the loads has
been taken into consideration according to their
final (as built) values. The creep and shrinkage
process during the construction stages could be
handled according to the real consrtuction dates as
well. Beyond the calculation of the deflections
according to several initial condition, the stresses
belonging to the developed strains and the
additional later deflections has been also checked. |