ENGINEERING CONSULTANTS
IN THE FRONT LINE OF BRIGDE DESIGN SINCE 1994
Design of highway, railway and pedestrian bridges;   Design of bridge reconstructions and retrofit works
Preliminary designs, studies;   Statical analyses and independent checks
Construction technology and auxiliary structures;   Consulting during design and site works
Actual
New bridge over the Mosoni-Duna on road no. 813
M4 motorway, bridge over the Millér-csatorna
New bridge over the Danube at Komárom
Study of the new bridge over the Danube at Mohács
Data serving
File interchange
Partners
Roden Kft.
Ferrobeton Rt.
Tenders

GOP-1.1.1-11-2012-0415

 H-1119 Budapest, Mohai út 38. www.pont-terv.com 
 (+36 1) 205-5877 bridges@pont-terv.com