Small structures |
|
|
M7 Motorway, Sió-Channel Bridge |
|
 |
Loading class: |
"A" (800 kN) |
Span: |
16,66 + 37,44 + 16,66 m |
Traffic lanes: |
0,565 m curb + 14,25 m roadway + 0,565 m curb |
Length of the bridge: |
71,60 m |
Width of the bridge: |
15,38 m |
Structural depth: |
1,48 – 2,38 m |
Depth of main trusses: |
1,20 – 2,10 m |
The new Bridge of the M7 Motorway over the
Sió-Channel was built in 2001-2002 as a part of
the new right carriageway. The type of the bridge is
identical with the existing left carriageway bridge
built in the late sixties. The three span continuous
R.C. beam has a three-cell box section with
increasing depth towards the piers. Within the scope
of the project the left carriageway bridge has been
reconstructed as well. The horizontal alignment of
the bridge is straight, the road profile has a grade
of 0,3%.
Building contractor: MAHÍD Rt.
Design: in cooperation with Roden Kft. |
|
|