The wild animal crossings on the Paks-Szekszárd section of the M6 Motorway are single span composite frame structures with 6 steel main girders. The legs of the frames are the abutment walls, founded rigidly with pile-walls. The bridges were built between 2009-2010.
Contractor: Bilfinger-Berger Ltd. |